For Workday Inventory, proof of delivery means matching the recipient, handover time, photographs, and signature to inventory stock requests and shipments. The SuiteFleet connection retains request and shipment lines so the team can reconcile accepted quantities and exceptions. Capturing proof and successfully updating the source record are separate checks.
Connector availability: SuiteFleet plans to publish its Workday Inventory connector on Workday Marketplace, subject to the marketplace review and release process.
1. Start with the Workday Inventory inventory stock request
Open the inventory stock request ISR-01842 for Northside Service Center and inspect its delivery destination, line quantities, and configured SuiteFleet relationship. The example contains SUP-100 | Examination gloves | 4 CASE and SUP-200 | Surface wipes | 6 CASE.

Open the inventory stock request and confirm its transfer type, source site, destination site, and reserved quantities. Create the appropriate picking lists and release only the quantities ready for shipment.
Workday Inventory supports issues to users or par locations and transfers between inventory sites. This example is a site-to-site transfer; the receiving site’s put-away is a separate step after transport. Workday inventory fulfillment.
2. Configure the evidence mapping
Preserve this relationship before exporting delivery work:

| Workday Inventory source | SuiteFleet destination | Rule |
|---|---|---|
| Tenant + stock request ID | Source request correlation | Do not use a sales-order key. |
| Request number | Order # / request reference | Keep source terminology. |
| Picking list / shipment ID | Allocation / reference | Retain multiple-zone relationship. |
| Source inventory site | Branch / hub | Physical departure point. |
| Destination site / contact | Ship To | Use receiving site address. |
| Inventory item / shipped quantity | Items | Preserve stock units. |
| Required arrival date | Delivery Date | Confirm site receiving date. |
| Dock window (configured) | After / Before | Use local site time. |
| SuiteFleet result | Workday Inventory destination | Writeback rule |
|---|---|---|
| Task ID / tracking | Delivery correlation for Inventory shipment ISH-01842 | Confirm field access during configuration. |
| Delivered / Failed | Configured delivery outcome | Confirm field access during configuration. |
| Recipient / completion time | Delivery evidence metadata | Confirm field access during configuration. |
| Photos / signature | Controlled evidence reference | Confirm field access during configuration. |
Record the receiving employee and destination site alongside shipment evidence. Transport receipt does not by itself confirm inventory put-away or internal service charging.
3. Define and check the evidence requirements
Agree the evidence policy before dispatch: which shipments need a recipient name, photographs, signature, and completion information, and who reviews missing evidence. Only require capture methods verified in the deployed driver workflow. Confirm that the connector can retrieve each required evidence field.

Before opening proof, match the task to Inventory shipment ISH-01842 through the correlation record. Names, addresses, and order display numbers alone are insufficient when the receiving team receives repeat or split shipments.
Distinguish the expected consignee from the person who actually accepted the goods. Validate file access and retention requirements with the deployment owner so a saved link remains useful to the intended support team.
4. Review proof of receiving team handover
Open Proof from the task or Reports → POD Analysis → Full proof. Review delivery photos, signature, recipient, and recorded completion together. Review Proof of pickup and Proof of delivery separately. Confirm receiving team receipt from the delivery record.

Do not infer received item quantities from a photograph, a signature, or the package count. Store the event time with its time zone. This example uses America/Chicago (CDT).
Zone picking can produce multiple picking lists for one stock request. Preserve their shipment relationships and reconcile shortages before marking the entire request delivered.
If there is a shortage, refusal, or disputed recipient, preserve the original evidence and record the exception. Retain the source shipment and line keys during review; do not create a new shipment simply because proof needs correction.
5. Store controlled evidence references
Confirm tenant-specific integration services, business-process security, and shipment references. Use approved Workday interfaces and a related delivery record for evidence where direct fields are unavailable. Workday Inventory.
Write recipient, event time, outcome, and evidence references only to validated destinations. Check whether the interface stores a file, an attachment relationship, or an external URL. Apply access controls to the evidence location; a link in a transaction does not itself grant appropriate access.
Handle status and attachment updates independently. If the status sync succeeds but a photo reference fails, retain the partial integration error and retry that operation safely. Verify the target record after retry before reporting a clean sync.
6. Verify the result in Workday Inventory
Record delivery evidence against the inventory shipment relationship. The destination team completes the configured put-away process; a SuiteFleet Delivered event must not silently perform that inventory action. Workday inventory fulfillment.

Inventory shipment ISH-01842; task SF-US-8107; recipient Elizabeth Parker; actual handover October 15, 2026 · 2:35 PM CDT (America/Chicago). First line: 4 shipped and accepted. Second line: 6 shipped and accepted, in the units shown.
Read back the linked record and review every outstanding allocation before reporting the full delivery requirement complete. Test partial shipment, partial acceptance, failed delivery, duplicate completion, and delayed writeback. Keep inventory posting, receipt evidence, and payment reconciliation under their respective configured rules.
Frequently asked questions
How should proof of delivery be matched in Workday Inventory?
Record the receiving employee and destination site alongside shipment evidence. Transport receipt does not by itself confirm inventory put-away or internal service charging.
Does a delivered task complete the Workday Inventory source workflow?
Record delivery evidence against the inventory shipment relationship. The destination team completes the configured put-away process; a SuiteFleet Delivered event must not silently perform that inventory action.

.webp)

